Town of Apple Valley
Home MenuDocuments & Handouts
STREETS
Lane Layouts and Right of Way
Street Vacation Application
Street and Roads Designation Plan
ENCROACHMENT
Encroachment Application
Trenching Standards
ROAD DEDICATION
Road Dedication
TRAFFIC
SUBMITTALS
Lane Layouts and Right of Way
Street Vacation Application
Street and Roads Designation Plan
ENCROACHMENT
Encroachment Application
Trenching Standards
ROAD DEDICATION
Road Dedication
TRAFFIC
NEW ADDRESSES
New address request form
SUBMITTALS
-Final Maps:
-Street Improvements Plan Submittal:
- 1st Submittal package
- Minimum requirements
- Construction and General notes
- Engineer's estimate sheet (contact Engineering Department)
- Sample sheets (contact Engineering Department)
-Grading Plan Submittal:
- Grading permits
- Submittal package
- Minimum requirements
- General notes
- Off-site grading letter
- Off-site Drainage Acceptance Letter
- Soils report waiver request
- Soils investigation report standard procedures and map
- WQMP (see "Stormwater" below)
- Rough Grading Inspection Report
- Final Grading Inspection Report
Stormwater:
- WQMP requirements
- Priority project WQMP submittal sheet
- Priority project WQMP template
- Small project WQMP template
Flood Hazard: