Name/ Project Location |
Documents |
Project Status |
Apple Valley 143 I-15 and Stoddard Wells Road |
Notice of Preparation |
|
|
Initial Study |
|
|
Notice of Availability
|
|
|
Notice of Determination Filing |
Approved by Planning Commission 11/15/2023 |
|
Draft EIR |
|
|
Final EIR |
|
|
Appendix A- NOP, IS, Scoping Comments
|
|
|
Appendix B1- Air Quality and Greenhouse Gas Emission Modeling
|
|
|
Appendix B2- Construction and Operational Health Risk Assessments |
|
|
Appendix C-Biological Resources Technical Report |
|
|
Appendix D-CRTR |
|
|
Appendix E- Geotechnical Study |
|
|
Appendix F-Phase I ESA |
|
|
Appendix G1- Preliminary Drainage Report |
|
|
Appendix G2- Preliminary Water Quality Management Plan |
|
|
Appendix H-Noise |
|
|
Appendix I-Draft TIA |
|
|
Appendix J-Water Supply Assessment |
|
Apple Valley I-15 Travel Center |
Notice of Preparation |
|
|
Notice of Availability |
|
|
Draft EIR
Final EIR
|
|
Apple Valley Village Specific Plan |
Notice of Preparation |
|
|
Notice of Availability |
|
|
Draft EIR |
|
|
Notice of Determination Filing |
Approved by Town Council |
Redwood West |
Administrative Report approving the Project |
|
|
Notice of Land Use Decision |
Approved by Director 9/18/2023 |
|
Notice of Pending Land Use Decision |
|
|
Draft Administrative Report with required Findings of Fact |
|
|
Final EIR |
|
|
Notice of Preparation
|
|
|
Initial Study |
|
|
Notice of Availability |
|
|
Draft EIR |
|
|
Appendix A. DDE NOP_s |
|
|
Appendix B. DDE AQ and GHG Report W Appendix |
|
|
Appendix C. DDE Biological Resources |
|
|
Appendix D. DDE Jurisdictional Delineation |
|
|
Appendix E. DDE Cultural Resources |
|
|
Appendix F. DDE Phase 1 ESA |
|
|
Appendix G. DDE Ordance Investigation
|
|
|
Appendix H. DDE Hydrology Report |
|
|
Appendix I. DDE Traffic Analysis |
|
|
Appendix Ia. DDE Traffic Appendix |
|
|
Appendix Ib. DDE VMT Analysis |
|
|
Appendix Ic. DDE Traffic Alternatives Analysis |
|
|
Appendix J. DDE Water Supply Assessment |
|
|
Notice of Determination |
|
1M Warehouse (Central & Lafayette) |
Administrative Report Approving the Project |
|
|
Notice of Land Use Decision |
Approved by Director 10/15/2024 |
|
Notice of Pending Land Use Decision |
|
|
Draft Administrative Report |
|
|
Final EIR |
|
|
CEQA Findings of Fact, Statement of Overriding Considerations |
|
|
Mitigation Monitoring and Reporting Program |
|
|
Appendix A Public Review Comment Letters |
|
|
Appendix B Trip Length Calculations |
|
|
Appendix C Mojave Desert Tortoise Data Sheet |
|
|
Appendix D Truck Turning Exhibit |
|
|
Notice of Preparation |
|
|
Initial Study |
|
|
Notice of Availability |
|
|
Draft EIR |
|
|
Appendix A- NOP, IS, Scoping Comments |
|
|
Appendix B1-Air Quality GHG and Energy Emission Calculations |
|
|
Appendix B2 Health Risk Assessment Calculations |
|
|
Appendix B3 Health Effects of Criteria Air Pollutants |
|
|
Appendix C- BTR September 2023 OPT |
|
|
Appendix D-Archaeological Resources Assessment |
|
|
Appendix E- Geotechnical Investigation |
|
|
Appendix F- Phase I Environmental Site Assessment |
|
|
Appendix G- Hydrology Study |
|
|
Appendix H- Water Quality Management Plan |
|
|
Appendix I- Noise Attachments |
|
|
Appendix J- Transportation Impact Analysis |
|
|
Appendix K- Water Supply Assessment |
|
|
Draft Notice of Determination |
|
|
Notice of Determination |
|
Inland Empire North Logistics Center |
Notice of Preparation |
|
|
Initial Study
|
|
|
Notice of Availability |
|
|
Draft EIR |
|
|
Appendix A Notice of preparation, Initial Study, Scoping Comments |
|
|
Appendix B1 Air Quality, Greenhouse Gas and Energy Modeling
|
|
|
Appendix B2 Health Risk Assessment
|
|
|
Appendix B3 Health Effects of Criteria Pollutants
|
|
|
Appendix C1 Biological Existing Conditions Report
|
|
|
Appendix C2 Burrowing Owl Relocation Plan
|
|
|
Appendix D Non-Confidential Cultural Resources Assessment Report |
|
|
Appendix E Paleontological Resources Assessment
|
|
|
Appendix F Geotechnical Reports
|
|
|
Appendix G Phase I Environmental Site Assessment
|
|
|
Appendix H1 Preliminary Hydrology Report
|
|
|
Appendix H2 Preliminary Water Quality Management Plan
|
|
|
Appendix H3 Water Supply Assessment Report
|
|
|
Appendix I1 Field Noise Data
|
|
|
Appendix I2 Construction Noise Modeling Data
|
|
|
Appendix I3 Traffic Noise Modeling Data
|
|
|
Appendix I4 On-Site Noise Modeling Data
|
|
|
Appendix J Transportation Impact Analysis
|
|
Lake Creek Logistics Center Project |
Notice of Preparation
|
|
Cordova Complex and Quarry at Pawnee Warehouse Project
|
Final EIR |
|
|
CEQA Findings of Fact, Statement of Overriding Considerations |
|
|
Mitigation Monitoring and Reporting Program |
|
|
Appendix A - Draft Environmental Impact Report Comment Letters |
|
|
Appendix B - On-Site Truck Turning Templates |
|
|
Notice of Preparation |
|
|
Initial Study |
|
|
Notice of Availability |
|
|
Draft EIR |
|
|
Appendix A Notice of Preparation, Initial Study, and Scoping Comments |
|
|
Appendix B1-Air Quality GHG and Energy Emission Calculations |
|
|
Appendix B2 Construction and Operational Health Risk Assessment |
|
|
Appendix B3 San Joaquin Valley Air Pollution Control District Full Amicus Briefs |
|
|
Appendix C Traffic Impact Analysis |
|
|
Appendix D Biological Resources Technical Report |
|
|
Appendix E Cultural Resources Assessment |
|
|
Appendix F Geotechnical Exploration |
|
|
Appendix G Paleontological Resource Assessment |
|
|
Appendix H Phase I Environmental Site Assessment |
|
|
Appendix I Hydrology Report |
|
|
Appendix J Water Quality Management Plan |
|
|
Appendix K Water Supply Assessment |
|
|
Appendix L Noise Modeling |
|
|
Appendix M Sewer Study |
|
|
Appendix N Electrical Engineering Analysis Report |
|
|
Notice of Determination |
|
Redwood West Cordova |
Administrative Report approving the Project |
|
|
Draft Administrative Report |
|
|
Notice of Land Use Decision |
Approved by Director 7/16/2024 |
|
Notice of Pending Land Use Decision |
|
|
2009 General Plan EIR Addendum |
|
|
Mitigation Monitoring and Reporting Program |
|
|
Appendix A AIR QUALITY AND GREENHOUSE GAS REPORT |
|
|
Appendix Ba BIOLOGICAL RESOURCES ASSESSMENT |
|
|
Appendix Bb DRAFT DESERT TORTOISE FOCUSED SURVEY |
|
|
Appendix C Jurisdictional Assessment |
|
|
Appendix D PHASE I HISTORICAL/ ARCHAEOLOGICAL RESOURCES SURVEY |
|
|
Appendix E GEOTECHNICAL INVESTIGATION REPORT |
|
|
Appendix F PHASE I ENVIRONMENTAL SITE ASSESSMENT |
|
|
Appendix G PRELIMINARY HYDROLOGY STUDY |
|
|
Appendix H Water Supply Assessment |
|
|
TRAFFIC ANALYSIS Report |
|
|
Trip Generation Comparison |
|
|
Water Quality Management Plan |
|
|
Sewer Feasibility Study |
|
|
Notice of Determination |
|